Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 I 10 a SYMBOL DEFINITION MISSING SYMBOLS A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS REQUIRED 25 LAST NO. USED 16 NO MISSING
|
OCR Scan
|
31MR06
ENCL05ED
|
PDF
|
LB1501
Abstract: M4695002 iso 11469
Text: 16 15 14 13 12 11 10 s S A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M DWG STATUS MISSING SYMBOLS SYMBOL DEFINITION DATE TOTAL NO OF INSPECTIONS REQUIRED NO MISSING SYMBOL
|
OCR Scan
|
30MR06
PE153791
PE154530
M4695003
M4695002
LB1501
iso 11469
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 12 11 $ B 10 SYMBOL DEFINITION QöD A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTIONIT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED 22 LAST NO. USED 22 NO MISSING SYMBOL NUMBER
|
OCR Scan
|
17MR06
|
PDF
|
12103500
Abstract: No abstract text available
Text: 16 15 14 13 12 11 $ 10 S MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED NO MISSING
|
OCR Scan
|
110C05
PE132691
31MR06
27AP07
M3649XXX,
12103500
|
PDF
|