Untitled
Abstract: No abstract text available
Text: 12 11 10 B MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTIONIT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. H TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED 10 NO MISSING SYMBOL NUMBER
|
OCR Scan
|
IBMY06
24AP07
04DE06
08FE06
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 I 10 a SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED NO MISSING
|
OCR Scan
|
19DE03
29JA04
08FE06
16AU06
06JA05
12JL04
01DE03
PE123072i
ENCL05ED
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 $ 10 B SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED 8 LAST NO. USED 8 DWG STATUS
|
OCR Scan
|
210C05
08FE06
|
PDF
|
Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 $ 10 B SYMBOL D E F I N I T I O N M IS SIN G SYMBOLS A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED
|
OCR Scan
|
08FE06
28MR06
210C05
|
PDF
|